HOW TO COMPILE A PROJECT MANAGEMENT PLAN FOR AN OVERSEAS CONTRACTING CONSTRUCTION PROJECT

引用
@@ Generally before the commencement of an international project contract,the Client and the Consulting Engineer may require the Contractor to submit a relevant Project Management Plan(PMP)according to the provisions prescribed in the tender documents or contract documents within a specified period of time.The approved PMP by the Client and the Consulting Engineer shall be strictly abided by the Contractor during the whole process of contract implementation.

CONSTRUCTION PROJECT、Project Management、contract documents、Engineer、international、Client、PMP、during

F28;TU7

2011-02-23(万方平台首次上网日期,不代表论文的发表时间)

55-57

相关文献
评论
暂无封面信息
查看本期封面目录

国际工程与劳务

1672-2884

11-5034/F

2010,(9)

相关作者
相关机构

专业内容知识聚合服务平台

国家重点研发计划“现代服务业共性关键技术研发及应用示范”重点专项“4.8专业内容知识聚合服务技术研发与创新服务示范”

国家重点研发计划资助 课题编号:2019YFB1406304
National Key R&D Program of China Grant No. 2019YFB1406304

©天津万方数据有限公司 津ICP备20003920号-1

信息网络传播视听节目许可证 许可证号:0108284

网络出版服务许可证:(总)网出证(京)字096号

违法和不良信息举报电话:4000115888    举报邮箱:problem@wanfangdata.com.cn

举报专区:https://www.12377.cn/

客服邮箱:op@wanfangdata.com.cn