期刊专题

Optimum selection on bridge erection with floating crane in East China Sea Bridge and Hangzhou Bay Bridge

引用
@@ IntroductionWith the rapid development of China′s economy, many bridges will be built over the Chinese coastal waters of Pacific Ocean. Among them, construction of East China Sea Bridge has been commenced in June 2001, and will be completed at the end of 2005, Hangzhou Bay Bridge was also started to construct in June 2003(Fig. 1). These two ultralong bridges are designed as twin expressway bridges standing side by side each carries a 3-lane one-way carriageway. The total width is 31.5m and 33.0m respectively. East China Sea Bridge starts from Nanhui District, Shanghai and extends to the Yangshan Deep Water Port Area, which is located at one of the Qiqu Islands. The total length of the bridge is about 31.0 km, in which 25 km are on the sea, and 22 km is in the unnavigable region. Hangzhou Bay Bridge across the mouth of Qiantang River.

Hangzhou Bay、East China Sea、Chinese coastal waters、rapid development、Qiantang River、Pacific Ocean、Deep Water、Port Area

P7 ;P5

2007-07-26(万方平台首次上网日期,不代表论文的发表时间)

共2页

24-25

暂无封面信息
查看本期封面目录

国际船艇

1008-116X

11-3939/U

2004,(6)

专业内容知识聚合服务平台

国家重点研发计划“现代服务业共性关键技术研发及应用示范”重点专项“4.8专业内容知识聚合服务技术研发与创新服务示范”

国家重点研发计划资助 课题编号:2019YFB1406304
National Key R&D Program of China Grant No. 2019YFB1406304

©天津万方数据有限公司 津ICP备20003920号-1

信息网络传播视听节目许可证 许可证号:0108284

网络出版服务许可证:(总)网出证(京)字096号

违法和不良信息举报电话:4000115888    举报邮箱:problem@wanfangdata.com.cn

举报专区:https://www.12377.cn/

客服邮箱:op@wanfangdata.com.cn