10.3969/j.issn.2214-9147.2016.02.014
Design and commissioning of a semi-confined blast chamber
circular disc
12
TN
The authors would like to thank the staff in the workshop at LS, CSIR under the leadership of Mr L Broodryk for their support in manufacturing SEmily and the staff at DBEL for support during the experimental tests. The financial support from ARMSCOR is acknowledged
2016-05-17(万方平台首次上网日期,不代表论文的发表时间)
共12页
147-158